The New Loft
Wednesday, April 23rd, 2008Moving into my new building this weekend, formerly an art gallery and studio. It has been rezoned recently and is now considered multi-use. Some before pics below, I’ll be sure to take lots of photos of the progress. Maybe I will do a time lapse when I paint the rooms.
When you enter the front door, this is what you see.

Reverse View

This is the 2nd gallery room, includes the huge 34′x28′ room, also a hallway to the bathroom, and kitchen.

Reverse View

View of the ceiling from the middle room

The Bedroom. Needs a lot of work, 2nd bathroom on the left and closet on the right

The rest of the building, the warehouse. Stadium style HID overhead lighting, 22′ barrel roof, sound recording room in the far right. Vehicle ramp on the left.
